The list of major works done by our company
| CLIENT | SUBJECT OF AGREEMENT | YEAR |
| Powen-Wafapomp Group SA Warszawa | Modernisation of the cooling water pump station at CH&P Plant "KRAKÓW" | 2009-2010 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of the KW5 water boiler exhaust ducts | 2009 |
| CH&P Plant "KRAKÓW" S.A. | Disassembilng of the KW3 water boiler electrofilter, switchrooms, exhaust fans and replacement of the pipelines | 2009 |
| CH&P Plant "KRAKÓW" S.A. | Repair and adaptation to the current safety regulations of coal bunker area ventilation system | 2009 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of startup injection system of the no 1 & 2 torbosets (OP-380) at CH&P Plant "KRAKÓW" S.A. - mechanical works, disassembling/assembling | 2009 |
| BCE Systems Sp. z o.o. Bielsko-Biała |
Manufacturing and installation of steam ash blowers, blow out and with rotating air heaters for the no 9 OP-140 boiler at Energetyka Dwory Sp. z o.o. in Oświęcim | 2009 |
| Pentol-Enviro Sp. z o.o. Kraków | Installation of monitoring system of the no 5 water boiler at CH&P Plant "KRAKÓW" S.A. | 2009 |
| Zespół Elektrowni Wrocławskich "Kogeneracja" SA | Adaptation of the K-2 and K-3 boilers to an automated operation. The range of works: replacement of the coal hopper no 52 rod gate of the WP 120/KW-5 boiler at Zespół Elektrociepłowni Wrocławskich "Kogeneracja" SA. |
2009 |
| ZRE Kraków Sp. z o.o. | Periodical and scheduled overhaul of the no 3 OP-430 steam boiler at the CH&P Plant "KRAKÓW" S.A. | 2009 |
| Vattenfall Heat Poland SA | Overhaul of the installation and auxiliary devices of the Tz 9 and Tz 10turbosets at the CH&P Plant Siekierki in Warsaw | 2009 |
| Vattenfall Heat Poland SA | Overhaul of the 0,4 kV switchroom and control room at the CH&P Plant Siekierki in Warsaw | 2009 |
| Montorem S.A. Kraków | Manufacturing and installation of electric installation for biomass assembly at the CH&P Plant Siekierki | 2009 |
| CEZ Polska Elektrownia Skawina SA | Overhaul of the WK-100-6-M 110 MW TG5 turboset at CH&P Plant Skawina SA | 2009 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of startup injection system of the no 1 & 2 torbosets at CH&P Plant "KRAKÓW" S.A. | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Repair of indoor lighting in the main warehouse | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Manufacturing and delivery of pressure elements for the WP-120 no 5 boiler - downcomers | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Repair of lighting at the CH&P Plant "KRAKÓW" facilities | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of the WP-120 No 5 water boiler | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Installation of surge protection in the 6kV switchroom | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the installation and auxiliary devices of the TG-1 turboset at the CH&P Plant "KRAKÓW" S.A. | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Scheduled overhaul of the OP-430 no 4 boiler | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Scheduled overhaul of the OP-380 no 1 boiler | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Scheduled overhaul of the OP-430 no 3 boiler | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Scheduled overhaul of the OP-380 no 2 boiler | 2008 |
| BCE Systems Sp. z o.o. Bielsko-Biała | Manufacturing and installation of the ash blowers for the OP-14 no 9 boiler at the Energetyka Dwory S.A. in Oświęcim | 2008 |
| Polteron Firma Inżynieryjna Sp. z o.o. Kraków | 1. Modification of the steam supply lines no 1 & 2 for the intermediate reservoirs (with materials delivery) at the Elektrociepłownia Jaworzno CH&P Plant 2. Modification and installation of compressed air pipelines (with components delivery) |
2008 |
| Nicromet Bestwinka | Delivery and installation of drive mechanism for an overhead traveling crane Q=20t | 2008 |
| PKP CARGO - Kraków | Reapair and maintenance of heat exchanger | 2008 |
| Polteron Firma Inżynieryjna Sp. z o.o. Kraków | Manufacturing and installation of adjustable floor at the EC-3 CH&P Plant in Brzeg Dolny | 2008 |
| EC Electronics Sp. z o.o. Kraków | Installation of vibration measuring equipment for exhaust and air fans | 2008 |
| ZRE Kraków Sp. z o.o. | Exchange of screening panels of the OP 380 no 1 boiler | 2008 |
| ENERGOSERWIS S.A. Lubliniec | Periodical overhaul of the TG4 turboset - overhaul of the TGH 120 no 4 generator | 2008 |
| TURBOCARE Sp. z o.o. Wrocław | Overhaul of the 13UP110 TG-4 turboset | 2008 |
| ArcelorMittal Poland S.A Oddział w Dąbrowie Górniczej | Delivery and installation of the AKAPP Multiconductor conductor bar for the hot rolling mill at the hall no VIII | 2008 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of an intermediate overheater of the OP 380 No 2 boiler at CH&P Plant "KRAKÓW" | 2007 |
| CH&P Plant "KRAKÓW" S.A. | periodical overhaul of fresh steam coolers of the OP 380 No 2 boiler at CH&P Plant "KRAKÓW" | 2007 |
| CH&P Plant "KRAKÓW" S.A. | scheduled repair of the OP 380 No 2 boiler at CH&P Plant "KRAKÓW" | 2007 |
| Miejskie Przedsiębiorstwo Energetyki Cieplnej Kraków S.A. | Modernisation of heat exchangers' facilities in Cracow - Nowa Huta. Installation and building works | 2006 - 2007 |
| Energoremont Krasnystaw | Repair of regenerative heat exchangers 3XW1, 2, 3 at CH&P Plant "KRAKÓW" | 2006 |
| P.R.U.E. Katowice | Overhaul of the TG-3 turbine (13 UP 110 type) at CH&P Plant "KRAKÓW" | 2006 |
| Elektrobudowa S.A. Katowice | Delivery and installation of the AKAPP Multiconductor conductor bar for the K-11 boiler's travelling cranes at Power Plant Skawina | 2006 |
| SJOS Wrocław | Delivery of the R1/P 0,4 kV main switchboard and installation of the control system at Brzeg Dolny facility | 2006 | Energoservis Lubiniec | Execution of works (mechanical and electrical part, measurement, control and automation equipment) at generator set no 2 in CH&P Plant "KRAKÓW" | 2005 |
| Piecha-Solak Katowice | Diagnostical repair of TG-3 (13 UP 110) | 2005 |
| CH&P Plant Białystok | safety devices inspection of OP-230 boiler no 8 |
2005 |
| Zakład Usługowo - Produkcyjny "Cominex" Kraków | Installation of second power feeding circuit | 2005 |
| SJOS Wrocław | Delivery of the main switchboard and assembling of control system at the plant in Dolny Brzeg | 2005 |
| CH&P Plants Warszawskie S.A. |
Overhaul of 2 pcs. of overhead travelling cranes used for calx removal at CH&P Plant Siekierki | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Replacement of steam pipeline elements at K2 (OP-380) boiler | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of turbine part of 13 UK 125 (TG2) turboset SP | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Demolition of KW2 water boiler and it's whole auxiliary equipment (also removal of elements common with working boilers) and securing the object after demolition | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the TG-4 turbine (13 UP 110 type) and it's auxiliary equipment | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Encasing of turbine oil reservoirs of TG-3 and TG-4 | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Scheduled overhaul of OP-380 no 1 & 2 and OP-430 no 3 & 4 steam boilers | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of TG 1 (13 UK 125 type) and it's auxiliary equipment | 2005 |
| CH&P Plant "KRAKÓW" S.A. | Repair of lightning in the plant facilities | 2005 |
| Technopomiar Kraków | Recreating of physicochemical measuring equipment of steam-water circuit after malfunction of set no 2 at CH&P Plant "KRAKÓW" S.A. | 2004 |
| Alstom Power - Elbląg | Diagnostic inspection of steam pipelines of B-2 set at CH&P Plant "KRAKÓW" S.A. |
2004 |
| Energoprojekt-Katowice | Building of vacuum pumps installation of TG-2 (turbine set 13 UK 125 - TG2) at CH&P Plant "KRAKÓW" S.A. | 2004 |
| CH&P Plant "KRAKÓW" S.A. | Repair of lightning in the plant facilities | 2004 |
| PRONOVUM Katowice | Repair of main steam pipelines of B-2 set at CH&P Plant "Kraków" | 2004 |
| Budimex Dromex Kraków | Modernisation of electrofilters and set boilers no 1, 2 & 3 at CH&P "Kraków" (mechanical part) | 2004 |
| PRONOVUM Katowice | Preparation of K-1 & K-4 boilers for diagnostic inspection in CH&P "Kraków" | 2004 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of overhead travelling crane no 1 and repair hoist in the turboset room | 2004 |
| CH&P Plant "KRAKÓW" S.A. | Supply of 13UK125(TG3) turbine parts for main overhaul as the member of consortium with PRUE Katowice sp. z o.o. | 2004 |
| CH&P Plant "KRAKÓW" S.A. | Demolition of KW2 water boiler together with whole auxiliary equipment, securing the object after demolition and disassembling of elements common with working boilers | 2003- 2004 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of the PIX preparation installation | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Repair of hydrogene insulation and centering of 13 UP 110 TG-3 turbine generator rotor | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Repair of power feeding and control devices of TN 13 A, B coal belt ploughs | 2003 |
| SIMPTEST Katowice | Carrying out the project and repair of carrying construction of dust ducts, hot air ducts and OP-430 type boiler auxiliary equipment at CH&P Plant "Kraków" | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Manufacture and replacement of the top and bottom floor and the top and bottom sliding metal plate with anticorrosion protection of the slag skimmer tub of OP-430 steam boiler | 2003 |
| APS -Energia | Supply of parts and modernisation works execution of DC circuits at CH&P Plant Żerań | 2003 |
Polskie Huty Stali Huta im. |
Overhaul of slime scrapers power feeding at "Suchy Jar" | 2003 |
| Elektrociepłownie Warszawskie S.A. |
Repair of power feeding of slag removal overhead travelling cranes and loader at CH&P Plant Siekierki | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Repair of AKAPP conductor bar of loader-excavator (with overhead protection) | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Replacement of two pieces of soft start & stop devices of fresh water pumps' motors at "Białucha" pumping station | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of No. 5 & 6 water boilers (WP 120 type) and 5EF & 6EF electrofilters | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of turbine oil transportation instalation - 2nd stage | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of 13UP 100 TG 3 Turbine together with auxiliary devices | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of between-ceiling crate of OP-430 No. 3 boiler | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of 13UK 125 TG 2 turbine together with auxiliary devices | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of OP-380 No. 1 boiler and OP-430 No. 3 & 4 together with auxiliary devices | 2003 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of OP-380 No. 2 boiler together with auxiliary devices | 2003 |
| Alstom Power | Installation of heat distribution network - "Kasprowy" Hotel in Zakopane. Works executed in the years 2002 - 2003 | 2002- 2003 |
| Alstom Power | Building of heat distribution networks in Zakopane - 5th stage (continuation of works in the years 2001-2003) | 2001- 2003 |
| Huta im. Tadeusza Sendzimira Kraków | Repair of scrapers' power supply No. 5 & 6 KOŚ - KP-E4 | 2002 |
| War-No Sp. z o.o. | Overhaul of coal supply, slug and calx removal devices at CH&P Plant "KRAKÓW" S.A. (3 years agreement) | 2002 |
| Elektromontaż 2 Kraków | Overhead travelling crane overhaul at DTE | 2002 |
| War-No Sp. z o.o. | Repair of electrical installation and control, measurement & automation devices of loader-excavator at CH&P Plant "KRAKÓW" S.A. | 2002 |
| War-No Sp. z o.o. | Modernisation of electrical installation and control, measurement & automation devices of water treatment facility - assembly No. 14 | 2002 |
| Geofizyka Kraków | Servicing of heat exchanger at Łukasiewicza street 3 and Rzebika street 6 | 2002 |
| Steel Works Huta im. Tadeusza Sendzimira Kraków | Repair of electric machines of S-200 locomotives at DLT | 2002 |
| PUP CERBUD Nowy Sącz | Building of heat distribution networks, connection of " Giewont" Hotel in Zakopane - 5th stage | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of electrical installation of turbine oil transportation instalation - 1st stage | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Internal inspection of OXU preliminary water heater and OSS2 vapours heater | 2002 |
| NPA Skawina | Assembling of hydraulic grasper adaptation device for overhead travelling crane (Q= 5T) | 2002 |
| Elektrociepłownie Warszawskie S.A. | Installation of power supply for slag removal overhead travellig crane No.1 at CH&P Plant "Siekierki" | 2002 |
| Energoprojekt Katowice | Modernisation of electrical installation and control, measurement & automation devices of water treatment facility (2nd stage of works) at CH&P Plant "KRAKÓW" | 2002 |
| Fundacja Sanktuarium Bożego Miłosierdzia - Kraków-Łagiewniki | Assembling electrical installations at "Centrum Apostolstwa Miłosierdzia" in "Sanktuarium Bożego Miłosierdzia" area in Kraków - Łagiewniki. | 2002 |
| Zakłady Aparatury Pomiarowej "Kwant" Kraków | Electrical and mechanical works on turboset boiler No.2 at CH&P Plant "KRAKÓW". Installation of measurement devices of burners - 2nd stage | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Repair of PWCH pumping station lightning | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Repair of the OP-380 (K1,K2) and OP-430 (K3,K4) type boilers together with auxiliary devices | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the 13 UK-125 (TG 1) type turbine together with auxiliary devices | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the 13 UP-110 (TG 3) type turbine together with auxiliary devices. | 2002 |
| CH&P Plant "KRAKÓW" S.A. | Emergency swap of the main rotor of the TGH-120 generator of the turboset no 1. Spare rotor has been installed. | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Modernistaion of the pressurised air installation of the K1 - K4 boilers' steering | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the 13 UP-110 (TG 4) type turbine together with auxiliary devices. | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Removal of an oil boiler together with the pumping station of the peak-load boiler room | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Modernisation of the photocells' cooling air installation of K1 - K4 boilers | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Swap of the NV 3.4 type pumps for the monoblock gPJM type pumps | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the 13 UK-125 (TG 1) type turbine together with auxiliary devices. | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Building of the heavy oil (mazoute) recirculation installation of the ignition burners of the K1 and K3 boilers | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the OP-380 and OP-430 type boilers together with auxiliary devices | 2001 |
| CH&P Plant "KRAKÓW" S.A. | Modification of the hydrokinetic transmission clutch joint of the pumping unit 1PZ1 | 2001 |
| Energoprojekt Katowice | Modernisation of the water treatment facility at the CH&P Plant "KRAKÓW" S.A. - mechanical and electical works, automation and control devices. | 2001 |
| AlstomPower Flow System Elbląg | Building of the heat network main pipeline in Biały Dunajec and building of three pumping stations (Pozawodzie, Poronin, Ustup ) | 2001 |
| Zespół Opieki Zdrowotnej Miechów | Modernisation of the steam pipeline from an oil-gas boiler room to The St. Ann's Hospital | 2000 |
| TKW Combustion Głowno | Oil installation of ignition burners of the OP-230 boiler at CH&P Plant Skawina | 2000 |
| Elektrociepłownie Warszawskie S.A. | Modernisation of the 220V DC circuit and electric switchgear of the Ofz boilers at CH&P Plant Żerań | 2000 |
| CH&P Plant Siekierki Warszawa | Rebuilding of the travelling crane's electrical equipment | 2000 |
| CH&P Plant Siekierki Warszawa | Replacement of cables and cable trolleys of a travelling crane | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Building of a gas boiler room for the "ELEKTRA " manufacture at Sołtysowska street | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Building of the lighting installation of the Collegium Maius Museum at Jagiellonian University in Kraków | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Repair of non-return valves of the PC-14 pumps in PWCH pumping station | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Repair of fumes' ducts and additional works on electrofilters | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Building of the heavy oil (mazoute) recirculation installation of the ignition burners | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Replacement of no. 4 OP-430 type boiler's screening panels | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of lighting instalation | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of the travelling crane, type: Bumar-Głogów- 8T | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Overhaul of WP-120 type water boilers no. 4-6 and OP-430 type turboset boiler together with auxiliary devices |
2000 |
| CH&P Plant "KRAKÓW" S.A. | Repair of steam duct | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Repair of the heat network centers | 2000 |
| CH&P Plant "KRAKÓW" S.A. | Scheduled repair of the engine room TG 1, 2, 3, 4 devices |
2000 |
| Geotermia Podhalańska S.A. | Building of preinsulated heat distribution networks (ABB system) at Podhale area | 1999- 2001 |
| Zakłady Automatyki Przemysłowej S.A. | Starting of industrial automatics devices at CH&P Plant "KRAKÓW" S.A. - set no 3; manufacturing and installing of inlets | 1999 |
| VIRMAN sp z o.o. | Designing of power and lghting installations of "ETRANS" garage complex in Łaziska - electrical part | 1999 |
| Telekomunikacja Polska S.A. Kraków | Overhaul of a central heating installation in building at Grochowska street | 1999 |
| Promerol S.A. Kryspinów | Building of central heating network at Batorego 15b street and an heat exhange facility at Konarskiego 39 street - technology, electrical and automation & control installations | 1999 |
| Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji w Krakowie | Overhaul of control boxes at "Kujawy" water treatment facility | 1999 |
| Łęgprzem sp. z o.o. Kraków | Building of local heat distribution network and modernisation of central heating centre in an area of RE Kraków Podgórze, Niwy 12 street | 1999 |
| Energoprojekt Katowice S.A. | inventory of installation changes in electrical power & control circuits of K2 & K3 buildings at power plant "Jaworzno III" | 1999 |
| Energoprojekt Katowice S.A. | Manufacture of electrical circuit control display at CH&P Plant "Kraków" S.A. | 1999 |
| Energoprojekt Katowice S.A. | Executive project in a freamework of control, automation and measurement circuits modernisation for no 3 set at CH&P Plant "Kraków" S.A. | 1999 |
| Energoprojekt Katowice S.A. | Prefabrykacja i dostawa urządzeń elektrycznych dla wentylacji budynku K2 i K3 | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Prace elektryczne w ramach modernizacji pomiarów specjalnych turbozespołu nr 3 | 1999 |
| CH&P Plant Siekierki | Modernizacja obwodów wtórnych i sterowniczych 6 i 0,4 kV związanych z CDC | 1999 |
| Elektrobudowa S.A. Oddział Montaży w Krakowie | Prowadzenie stałej konserwacji urządzeń dźwignicowych | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Modernizacja zabezpieczeń elektrycznych bloku nr 3 i remont podrozdzielni prądu stałego bloku nr 3 | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie modernizacji rozdzielni 3BB - obwody wtórne | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Prowadzenie serwisu urządzeń klimatyzacyjnych i wentylacyjnych w obiektach elektrociepłowni | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie kotłowni gazowej w budynku PRK ul. Wrocławska 91 | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Remont kapitalny instalacji oświetleniowej kotła bloku energetycznego nr 3 | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Modernizacja pompowni burzowej w części budowlanej i technologicznej | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie modernizacji instalacji oświetlenia tuneli kablowych, blok energetyczny nr 1 i 2 | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Remont turbin wraz z urządzeniami pomocniczymi | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Remont urządzeń sieci ciepłowniczej | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Remont kotłówOP 380 i OP 430 | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Remont rozdzielni 3CB | 1999 |
| BRIGEN S.A. | ModernizacjaStacji Wymienników Ciepła -KJ w Jastrzębiu Zdroju | 1999 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie 6 sztuk kompensatorów tkaninowych | 1999 |
| ABB Alstom Power | Remont modernizacyjny dwóch obrotowych podgrzewaczy powietrza typu BD25/1600 zainstalowanych na kotle OP 430 w Elektrociepłowni "KRAKÓW" S.A. | 1999 |
| CH&P Plant Białystok S.A. | Demontaż i montaż automatów SZR oraz wykonanie przeglądu
rozdzielni 6kV R03 s. A i B |
1999 |
| CH&P Plant Białystok S.A. | Remont turbozespołu Nr 2 i kotła K-7 w zakresie obwodów zabezpieczających i sterowania elektrycznego. | 1999 |
| Miejskie Przedsiębiorstwo Wodociągów i Kanalizacji w Krakowie | Remont kapitalny układu elektroenergetycznego w hydroforowni na os. Bohaterów Września | 1999 |
| TKW Combustion Głowno | Wykonanie modernizacji instalacji olejowej palników rozpałkowych na kotle OP-430 Nr 3 | 1999 |
| Promerol S.A. Kryspinów | Wykonanie pomiaru i ochrony przeciwporażeniowej lokalnych przepompowni ścieków | 1998 |
| CH&P Plant Białystok S.A. | Wykonanie modernizacji obwodów sterująco - sygnalizacyjnych | 1998 |
| Energoprojekt Katowice S.A. | Wykonanie projektu rozdzielni 0,4 kV w Elektrowni Jaworzno | 1998 |
| Cermegad sp. z o.o. Kraków | Wykonanie instalacji elektrycznej suszarni komorowej cegielni | 1998 |
| TKW Combustion Głowno | Modernizacja instalacji olejowej palników rozpałkowych kotłów 1 i 2 w Elektrociepłowni "KRAKÓW" S.A. | 1998 |
| Energoprojekt Katowice S.A. | Wykonanie projektu wykonawczego dla bloków 1, 2 w EC Kraków w ramach II etapu "Modernizacji układów sterowania pomiarów i automatyki bloków 1 - 4" | 1998 |
| Rafako Racibórz | Wykonanie i dostawa wciągnika w EC Siersza | 1998 |
| Energoserwis Lubliniec | Remont kapitalny generatora TGH -120 | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie sieci cieplnej dla zakładu ZREMB- FAMO w Krakowie | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie zasilania bram wjazdowych budynku głównego elektrociepłowni | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Modernizacja zabezpieczeń elektrycznych bloku nr 3 i remont podrozdzielni prądu stałego bloku nr 3 | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Modernizacja rozdzielni 3BB, 3CB |
1998 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie części do młyna MKM-25 | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie pomiarów ochrony przeciwporażeniowej | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Remont rozdzielni 1BB, 2BB | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Modernizacja układu zabezpieczenia elektrycznego, remont podrozdzielni blokówe nergetycznych 1 i 2 | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Remont planowy urządzeń maszynowni TG 1,2,3,4 | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Remont kotła OP-380 nr 1 i 2 , OP 430 nr 4 | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Remont instalacji c.o. Dla kotłowni szczytowej | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie układu zasilania w energię elektryczną pompowni wody z rzeki Białuchy | 1998 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie kompletnej instalacji modernizacji ujęcia wody z rzeki Białuchy | 1998 |
| CH&P Plant "KRAKÓW" S.A. | wykonanie instalacji sterowania i zasilania do zasuw na zbiornikach retencyjnych | 1997 |
| Instytut Pediatrii w Krakowie | Wykonanie sieci cieplnej wysokich parametrów | 1997 |
| Przedsiębiorstwo Przewozów Transportowych PKS | Wykonanie sieci cieplnej wysokich parametrów | 1997 |
| Opakolor Kraków | Wykonanie sieci cieplnej wysokich parametrów | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont w zakresie AKPiA kotła nr 3 i turbozespołu nr 3 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie instalacji dozowania fosforanów dla bloków nr 3 i 4 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Modernizacja rozdzielni niskiego napięcia RW | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont obwodów pierwotnych i wtórnych maszynowni bloku nr 2, 3 i obwodów pierwotnych kotłowni bloku nr 2, 3 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont obwodów pierwotnych i wtórnych nawęglania i odpopielania | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Montaż ram wibroizolacyjnych na pompowni OPS | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont AKPiA turbozespołu nr 2 oraz kotła OP-380 nr 2 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont planowy bloku nr 4 (adaptacja rozdzielni 4EM1 i 4EM2) | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont zabezpieczeń oraz obwodów wzbudzenia bloku nr 1 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont zawieradeł i rozdzielni bloku nr 1 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont rozdzielni 4BB 4CB | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont planowy obwodów wtórnych bloku nr 4 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont AKPiA na kotle bloku Nr 4 i maszynowni nr 4 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont obwodów pierwotnych kotła bloku nr 1, 4 oraz obwodów pierwotnych maszynowni bloku nr 1, 4 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont planowy turbozespołu i urządzeń pomocniczych bloku numer 1 i bloku numer 3 | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont planowy kotłów i urządzeń pomocniczych bloku numer
1 i bloku numer 3 |
1997 |
| CH&P Plant "KRAKÓW" S.A. | Przeprowadzenie serwisu ładowarko-zwałowarki | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Remont kapitalny rozdzielni niskiego napięcia | 1997 |
| CH&P Plant "KRAKÓW" S.A. | Wykonanie ram pod wentylatory młynowe | 1997 |
| CH&P Plant Białystok S.A. | Wykonanie diagnostyki napędów 6kV z użyciem systemu "Motormonitor" |
1997 |
| Biegonice Sp. z o.o. Kraków( cegielnia ) | Okablowanie urządzeń służących do rozładunku materiałów ceramicznych. | 1997 |
| Zakłady Remontowe Energetyki Kraków S.A. | Remont obrotowych podgrzewaczy powietrza w Elektrociepłowni "KRAKÓW" S.A. | 1997 |
| Zakłady Automatyki Przemysłowej S.A. | Wykonanie modernizacji układów automatyki i AKPiA w Elektrociepłowni "KRAKÓW" S.A. | 1997 |
| Energoprojekt Katowice S.A. | Wykonanie inwentaryzacji podrozdzielni, części elektrycznej bloku Nr 4, obiektów głównych i wtórnych generatora nr 4 w Elektrociepłowni "KRAKÓW" S.A. | 1997 |
| CH&P Plant "KRAKÓW" S.A., Miejskie Przedsiębiorstwo Energetyki Cieplnej Kraków, Przedsiębiorstwo Energetyki Cieplnej Jastrzębie | Montaż na terenie Krakowa i Jastrzębia Zdroju ponad 100 szt. w pełni zautomatyzowanych wymiennikowni ciepła (jedno lub dwufunkcyjnych), w ramach programu likwidacji niskiej emisji | 1995- 1999 |